Devot Logo
Devot Logo
ANTE AI

Revolutionizing information access with RAG-powered chatbot

A laptop screen displaying the chatbot interface.
Client name: NDA, Industry: AI, Services: AI development, Team size: 3 engineers, Architecture: RAG
Timeline

The challenges our client faced

Inside a growing organization, getting the right HR information quickly can make the difference between smooth operations and constant interruptions. But as policies, benefits, and internal documentation expand, finding accurate answers becomes a daily time sink. We built a RAG-powered assistant that turns existing knowledge into reliable, instant guidance.

Icon indicating time inefficiency

Spending too much time on manual tasks

HR professionals were dedicating a significant portion of their time to administrative tasks, which limited their focus on strategic initiatives.
Icon indicating trouble locating important documents

Low engagement with company benefits

Employees frequently had trouble locating important documents, which led to missed opportunities to utilize their benefits effectively.
Icon indicating difficulty to locate important information

Lack of a centralized information hub

As internal documentation grew, employees found it increasingly difficult to locate the information they needed.

AI-powered internal knowledge assistant

An AI-powered chatbot designed to streamline HR operations and improve information access.

A smartphone screen displaying the chatbot interface.

How we solved it

To address the inefficiency and improve information access, we created a chatbot capable of accurately identifying and providing relevant answers.

Frontend

The frontend was designed to deliver a responsive and intuitive experience.
Next.js
Next.js
Tailwind
Tailwind
TypeScript
TypeScript

Backend

The backend was developed to efficiently process and retrieve information from internal documentation.
LangChain
LangChain
Pinecone
Pinecone
OpenAI API
OpenAI API

The results

The solution brought significant improvements across key areas, directly addressing the client's main challenges.
Folder icon, representing easily accessible and clear documentation

Easily accessible and clear documentation

Checklist icon, symbolizing verified source documentation

Verified source documentation with direct access

Gear icon, indicating reduced workload for HR departments

Reduced workload for HR departments

Lightning bolt icon, representing faster and more accurate information retrieval

Faster and more accurate information retrieval

READY TO MAKE YOUR VISION A REALITY?

Let’s team up